Project

General

Profile

Spent time

Filters

Apply Clear

Hours: 2745.00

Date User Activity Issue Comment Hours
11/22/2017 Daniel Curtis Updating Updating ALT workstations 2.00 Actions
01/24/2017 Daniel Curtis Service Visit Supervise instrument decontamination, packaging, and shipping in Little Rock 2.00 Actions
01/25/2017 Daniel Curtis Service Visit Supervise instrument decontamination, packaging, and shipping in Little Rock; finalize packaging last remaining instruments and accessories 2.00 Actions
09/19/2016 Daniel Curtis Service Visit Service visit to FCS to fix leaky wetcart 5.50 Actions
01/06/2016 Daniel Curtis Troubleshooting Troubleshoot and repair chromecast network connection at Ajlune office network, run speed tests on network; found download throughput to be 1/4 of advertised speed. 1.50 Actions
12/21/2015 Daniel Curtis Troubleshooting Troubleshoot problem with Outlook 2010 refusing to send email out of IMAP account; used scanpst.exe to fix errors in PST files, disabled mail scanning in Avast, verified account credentials, checked port and security settings. 2.00 Actions
07/31/2017 Daniel Curtis Troubleshooting Work on Canto I 3 SORP; troubleshoot sample intercept missing and weak, adjust pressure offsets, encounter Master DAQ error 2.00 Actions
10/11/2018 Daniel Curtis Troubleshooting Office work; answer office calls, respond to emails, process bills, estimates, sales orders, and/or invoices 2.00 Actions
01/27/2016 Daniel Curtis Troubleshooting Troubleshoot problem with altservice.com domain expiring during the transfer of the domain to another registrar; NetworkSolutions temporarily reactivated altservice.com, initiated ICANN ACK Override to transfer altservice.com to Hover 2.50 Actions
07/12/2017 Daniel Curtis Troubleshooting Work on Canto I 3 SORP; troubleshoot high sample noise causing poor signal quality 2.50 Actions
04/18/2018 Daniel Curtis Troubleshooting Test Accuri ballast remake, clean/unclog Accuri SIP, clean Fortessa flow cell, setup test and clean second Accuri 3.50 Actions
12/14/2015 Daniel Curtis Troubleshooting Troubleshoot problem with Outlook 2010 causing outgoing emails to be stuck in different account's outbox; resolved by removing alternative sending group created shortly after mail server migration 4.00 Actions
09/25/2014 Daniel Curtis Troubleshooting Bug #465: Problem With DIVA 8 and Reverting to Previous DIVA Versions Troubleshoot Problem With DIVA 8 and Reverting to Previous DIVA Versions 4.00 Actions
10/01/2014 Daniel Curtis Troubleshooting Bug #465: Problem With DIVA 8 and Reverting to Previous DIVA Versions Troubleshoot and documented Problem With DIVA 8 and Reverting to Previous DIVA Versions 18.00 Actions
06/10/2016 Daniel Curtis Design Draft ALT brochure for Cyto 2016 conference 2.00 Actions
01/28/2016 Daniel Curtis Development Setup and test admin network connection in Pack & Ship office; successful retest bluray burning 0.50 Actions
02/03/2016 Daniel Curtis Development Office work; answer office calls, respond to emails, locate unknown parts based item numbers 1.00 Actions
02/18/2016 Daniel Curtis Development Take detailed pictures of ALT stream cam, cleaned dust and fingerprints off of LCD monitor, install and test stream cam on LSRII 1.00 Actions
04/11/2016 Daniel Curtis Development Quality assurance testing for manufactured laser heat sinks; found 2 heat sinks that were not up to quality standards. 1.00 Actions
01/19/2017 Daniel Curtis Development Research Data Acquisition platform for development of further projects 1.00 Actions
12/21/2017 Daniel Curtis Development Locate Redi-Flush box and partition vendor 1.00 Actions
02/05/2018 Daniel Curtis Development Wire barrel plug to 5A 12V power supply and test on Accuri 1.00 Actions
12/28/2015 Daniel Curtis Development Research & development meeting with Tony over 3D printer specifications; discussed 96-well chiller design variations 1.50 Actions
04/06/2016 Daniel Curtis Development Office work; answer office calls, respond to emails, process bills, estimates, sales orders, and/or invoices 1.50 Actions
08/25/2016 Daniel Curtis Development Work on development of ALT Vortran Laser Power Supply; finish BoM, CAM, and XYRS files in order to submit for quote 1.50 Actions
(26-50/919) Per page: 25, 50, 100

Also available in: Atom CSV